Purchasing › Purchase Requests › Approvals
When a purchase request (PR) needs your approval, you'll get a link. You open it,
review the request on a simple web page, and click your decision. That's the whole job —
you don't need to be in ClickUp or set any fields yourself.
You don't move statuses, assign the next person, edit any fields, or create anything in
NetSuite — all of that happens automatically once you submit.
When a request reaches your step, you get a notification with your personal approval
link — posted as a comment addressed to you (and emailed by ClickUp, depending on your
notification settings). The link is the official ping: click it and you're taken straight
to your approval page.
Your link is personal to you. It's tied to your name on this specific request —
please don't forward it. If someone else needs to approve, they'll get their own link
when it's their turn.
If you'd rather keep an eye out yourself, you can bookmark your ClickUp Notifications
inbox or an "Assigned to me" view so a link never slips by.

Everything you need is on the approval page — you don't have to open the task in
ClickUp. From top to bottom:
| What to check | Why it matters |
|---|---|
| Vendor | Is this an approved vendor, and the right one for this purchase? |
| Line items (description, quantity, rate) | Do the items and quantities make sense for the need? |
| Total | The page shows the summed total of the lines. Confirm it's what you expect. |
| Department / cost source | Is the spend landing against the right area? |
| Reason / description | Does the justification for the purchase hold up? |
| Ship-to (if shown) | Is it shipping where it should? |
The page header shows the request title and ID, and the footer confirms who you're
approving as — so you always know the page is meant for you.
Pick one of the three buttons, then press Submit decision:
The request moves to the next approver in the chain, or — if you're the last approval
needed — on to Purchasing to become a purchase order. Use this when everything checks out.
(No note required.)
The request goes to needs information and returns to the requester to add or fix
something — a quote, a clarified quantity, a corrected GL code. A note is required so
they know what you need; the page will ask for it before it lets you submit.
The request is declined and closed out at rejected. Use this when the purchase
shouldn't happen. A note is required — leave the reason so the requester understands.
After you submit, you'll see a confirmation on the page, and a short receipt is logged
on the request (your name, the decision, the date and time, and your note). You're done —
no follow-up needed.
Each request is routed through a chain of approvers built automatically from its
subsidiary, department, location, and dollar amount — so different requests go to
different people. You only ever handle your step; when you approve, the next person
gets their link automatically.
If you open the task in ClickUp, an Approval Progress field shows the whole chain at a
glance:
✅ Manager
⏳ Purchasing
⬜ Tyler J.
But you don't need to go looking — if you got a link, it's your turn.
Approvals shouldn't stall, so the system nudges on its own:
The simplest way to avoid all of that: click the link and act when it arrives.
If a request is changed after you've approved it — a different amount, a swapped item,
an edited GL code — it comes back around for approval, with a fresh link. This is
intentional: any change re-triggers the chain so nobody's sign-off is applied to a request
that no longer matches what they saw. There is no auto-approval anywhere in the flow, by
design.
The statuses tied to approvals (you'll mostly just click links — this is for reference):
| Status | What it means |
|---|---|
| New Request | Just submitted; not yet at your step. |
| Manager Review | Waiting on the requester's manager. |
| Purchasing Review | With the Purchasing team gate. |
| Needs Information | Sent back to the requester for more detail. |
| In Approval | Working through the higher-tier approval chain. |
| Approved – ready for po | Fully approved; heading to Purchasing to become a PO. |
| Ordered | A NetSuite purchase order has been created. |
| Rejected | Declined. |
A request titled "EG4 Solar Mini Split" needs you. You get the notification, click
your link, and the page shows:
- Vendor: an approved solar supplier
- Two line items totaling $7,980
- Reason: replacement units for a delayed install
The items and total look right, but the ship-to is blank. You click Needs Info, type
"Please confirm the delivery yard before I approve," and Submit. It goes back to the
requester; they add the location and resubmit; you get a fresh link, click Approve,
and it advances to Purchasing automatically.
Change orders work the same way — you get a link, review the page, click one decision,
and the system takes over. A few things are different, and they're worth knowing.
You're approving a change to a PO that already exists — not a new purchase. The page
shows the original amount next to the new amount, and the size of the change (for
example, was $100.00 · +$400.00), plus the single line being changed (item, quantity,
rate, amount, GL). The reason for the change is shown too.
If it reached you, it's already a material change. Small changes never come to
approval — anything within both ±10% and ±$10,000 of the original line is applied
directly by Purchasing with no sign-off. A change order only builds an approval chain when
it moves the number by more than that.
Everything else on this page — how you're notified, and re-approval when something changes
after you've signed off — works the same for change orders.